Valves for Water Supply Systems and Distribution – Algeria

Sistema di distribuzione dell’acqua potabile – Algeria
AfricaWhere:Africa
Butterfly valvesValve type:Butterfly valves
Water supplyIndustry:Water supply
Year:Year:2024
Valvola a galleggiante automatica CV100X Valvotubi

Automatic Float Control Valve

Valve Supply for the Biskra Water Distribution System

In May 2010, the supply of valves and pipeline components for the drinking water distribution system in Biskra, Algeria, was completed. The project required thousands of components to perform various functions throughout the network, including flow isolation, backflow prevention, pressure regulation, air management and pipeline connections.

Thousands of valves ranging from DN 65 to DN 500 were supplied, selected according to the technical specifications and installation requirements at different points throughout the network.

The supply included gate valves, dual-plate check valves with stainless steel discs, lug-type butterfly valves with EPDM-lined bodies, double-flanged butterfly valves, air release valves, dismantling joints and control valves.

The wide range of products reflected the complexity of the water distribution system. Each valve had to perform a specific function and integrate correctly into the network while meeting the nominal diameter, pressure rating and operating conditions established by the project specifications.

Valves for the Lakhdaria and Aomar Reservoirs

In 2011, the project continued with the expansion of the Lakhdaria and Aomar reservoirs, connected to the Koudiar Acerdoune Dam. The objective was to extend the water collection and distribution system by connecting reservoirs and infrastructure along the east–west and north–south corridors.

For this second phase, 30 tonnes of valves and components for water supply infrastructure were supplied, covering flow isolation, backflow prevention, filtration, pressure regulation and safety functions.

The supply included flat-body resilient-seated gate valves, oval-body resilient-seated gate valves according to DIN 3202 F5, check valves with rubber-coated discs, PN 25 and PN 40 non-return valves, steel Y-strainers, rubber expansion joints, dismantling joints, float control valves, pressure-reducing valves, safety valves and electric actuators.

A Complete Valve and Component Package for the Water Supply Network

The complexity of the project was determined not only by the quantity of products required, but also by the need to coordinate several different valve types and product categories.

Resilient-seated gate valves were used for flow isolation, while check valves protected the network against reverse flow. Y-strainers helped remove impurities from the water, while rubber expansion joints accommodated pipeline movements and absorbed mechanical stresses.

Float control valves, pressure-reducing valves and safety valves ensured the control and management of operating conditions. Electric actuators completed the system by enabling the automation of the valves specified in the project.

Rather than simply supplying individual products, the project required a fully coordinated package of valves and components designed to meet the operational requirements of the water distribution network.

A Single Technical Partner for Two Major Projects

The activities were carried out between 2010 and 2012, from the completion of the Biskra water distribution system to the subsequent expansion of the Lakhdaria and Aomar reservoirs.

Product selection, sourcing and supply management were handled through a coordinated approach, supporting the different project phases as they progressed.

Having a single technical point of contact helped reduce the number of suppliers and stakeholders involved while ensuring comprehensive oversight of the project requirements.

The result was the successful completion of two major supply projects for water infrastructure: thousands of valves ranging from DN 65 to DN 500 for Biskra, and 30 tonnes of valves and pipeline components for Lakhdaria, Aomar and the Koudiar Acerdoune Dam.

Two different projects, united by the same requirement: starting from detailed technical specifications and developing a complete supply package tailored to the actual operating conditions of the water distribution network.

One-stop-shop

Consulting

Technical Specification Review

Solutions

Complete, Coordinated Supply Package

Production

Delivery

Supply Management

After-sales